Case file / Food and beverage processing

Tulare dairy processing

A split roof-and-yard system for a dairy processor running 24 hours through the flush. A compressed-air survey done during the audit removed enough load to shrink the array before it was designed.

Array
1,480 kW DC
Inverters
1,250 kW AC
Annual output
2,590 MWh
Permission to operate
June 2025
Tulare dairy processing installation

Specification

The numbers on the record

All values are samples for this demonstration site.
ClientSierra Crest Dairy Foods
LocationTulare, CA
Array rating1,480 kW DC
Inverter rating1,250 kW AC (DC to AC ratio 1.18)
Modules2,691 at 550 W
StructureRoof array plus fixed-tilt yard field
Storage750 kW / 1,500 kWh
Modelled annual production2,590,000 kWh
Specific yield1,750 kWh per kW DC per year
Load offset44 percent
Construction window19 weeks
Permission to operateJune 2025

What made it hard

The constraints

  • Continuous 24-hour operation meant a large overnight base load that generation could never reach.
  • Compressed air was the second largest load in the plant and nobody had measured it in six years.
  • Roof area alone could not carry a meaningful share of the load, so the design had to cross two structures and a yard.

What we did about it

The approach

  • A leak survey and compressor sequencing change cut average compressed-air demand by roughly 90 kW before a single module was ordered.
  • Array split across the main process roof and a fixed-tilt field on unused yard, sharing one interconnection point.
  • Battery sized against the measured evening demand peak rather than the daytime average, since the tariff punished 4pm to 9pm demand hardest.
  • Harmonic and power-factor baseline measured during the audit, with drive filtering specified where distortion exceeded the utility threshold.

Result

Outcome

System size
1,480 kW DC / 1,250 kW AC
Modelled annual output
2,590,000 kWh
Load offset
44 percent
Compressed-air saving
About 90 kW of average demand removed
Evening peak reduction
610 kW
Tulare dairy processing detailTulare dairy processing, Tulare, CA

They found ninety kilowatts of leaking air before they sold us a single panel. That is not how this usually goes.

Rajan WhitfieldOperations Director, Sierra Crest Dairy Foods

Bring us the bill before you bring us the roof

Every project starts with twelve months of interval data and a load shape. The array comes after that, sized to what you actually use.