A split roof-and-yard system for a dairy processor running 24 hours through the flush. A compressed-air survey done during the audit removed enough load to shrink the array before it was designed.
- Array
- 1,480 kW DC
- Inverters
- 1,250 kW AC
- Annual output
- 2,590 MWh
- Permission to operate
- June 2025

Specification
The numbers on the record
| Client | Sierra Crest Dairy Foods |
|---|---|
| Location | Tulare, CA |
| Array rating | 1,480 kW DC |
| Inverter rating | 1,250 kW AC (DC to AC ratio 1.18) |
| Modules | 2,691 at 550 W |
| Structure | Roof array plus fixed-tilt yard field |
| Storage | 750 kW / 1,500 kWh |
| Modelled annual production | 2,590,000 kWh |
| Specific yield | 1,750 kWh per kW DC per year |
| Load offset | 44 percent |
| Construction window | 19 weeks |
| Permission to operate | June 2025 |
What made it hard
The constraints
- Continuous 24-hour operation meant a large overnight base load that generation could never reach.
- Compressed air was the second largest load in the plant and nobody had measured it in six years.
- Roof area alone could not carry a meaningful share of the load, so the design had to cross two structures and a yard.
What we did about it
The approach
- A leak survey and compressor sequencing change cut average compressed-air demand by roughly 90 kW before a single module was ordered.
- Array split across the main process roof and a fixed-tilt field on unused yard, sharing one interconnection point.
- Battery sized against the measured evening demand peak rather than the daytime average, since the tariff punished 4pm to 9pm demand hardest.
- Harmonic and power-factor baseline measured during the audit, with drive filtering specified where distortion exceeded the utility threshold.
Result
Outcome
- System size
- 1,480 kW DC / 1,250 kW AC
- Modelled annual output
- 2,590,000 kWh
- Load offset
- 44 percent
- Compressed-air saving
- About 90 kW of average demand removed
- Evening peak reduction
- 610 kW
Tulare dairy processing, Tulare, CAThey found ninety kilowatts of leaking air before they sold us a single panel. That is not how this usually goes.
More work
Other case files

Bring us the bill before you bring us the roof
Every project starts with twelve months of interval data and a load shape. The array comes after that, sized to what you actually use.
CSLB #1071482 (sample). Prevailing wage on public works. Engineers answer, not a call centre.