Case file / Cold storage and packing

Kern Ridge Packing

A grape packing and cold storage operation whose annual demand charge was being set by a single week of intake in late July. The array covers the daytime refrigeration load; the battery exists purely to hold the monthly peak down during pull-down.

Array
842 kW DC
Inverters
700 kW AC
Annual output
1,412 MWh
Permission to operate
March 2025
Kern Ridge Packing installation

Specification

The numbers on the record

All values are samples for this demonstration site.
ClientKern Ridge Packing Co.
LocationDelano, CA
Array rating842 kW DC
Inverter rating700 kW AC (DC to AC ratio 1.20)
Modules1,530 at 550 W
StructureBallasted rooftop, 10 degree south-facing rows
Storage500 kW / 1,000 kWh lithium iron phosphate
Modelled annual production1,412,000 kWh
Specific yield1,677 kWh per kW DC per year
Load offset63 percent
Construction window11 weeks
Permission to operateMarch 2025

What made it hard

The constraints

  • Interval data showed the July demand peak at 1,180 kW against a 12-month average of 690 kW, driven entirely by warm-product pull-down during intake.
  • The 2009 TPO membrane had roughly eleven years of life left, enough to install over but not enough to ignore in the ballast plan.
  • Twenty-two rooftop condensers with tight service clearances removed almost a fifth of the gross roof area from the usable layout.

What we did about it

The approach

  • Array sized to the year-round refrigeration base load rather than to the roof, keeping self-consumption above 90 percent of generation.
  • Battery sized in kW first: 500 kW of continuous discharge to cover the pull-down peak, with 1,000 kWh of usable energy to hold it for the two-hour event window.
  • Ballast blocks kept off every seam and drain path, with manufacturer-approved slip sheets so the membrane warranty was continued in writing.
  • Condenser airflow and service access mapped before layout, with a 4-foot maintained clearance at every unit and a continuous walkway spine.

Result

Outcome

System size
842 kW DC / 700 kW AC
Modelled annual output
1,412,000 kWh
Load offset
63 percent
Peak demand reduction
410 kW in the July billing period
Self-consumption
92 percent of generated kWh
Kern Ridge Packing detailKern Ridge Packing, Delano, CA

The array was the easy part. What changed our bill was sizing the battery against the one week that sets the whole year.

Marisol IbarraPlant Manager, Kern Ridge Packing Co.

Bring us the bill before you bring us the roof

Every project starts with twelve months of interval data and a load shape. The array comes after that, sized to what you actually use.

CSLB #1071482 (sample). Prevailing wage on public works. Engineers answer, not a call centre.

Cookie preferences

Choose which cookies you allow. You can change this at any time from the link in the footer.