Commercial solar EPC since 2014

Kern County / Tulare County / Kings County / Fresno County

(661) 555-0183

What we build

Eight things we build, and one we do first

Generation, storage and the infrastructure between them. Every one of these starts with an energy audit, because sizing a system without a load shape is guessing with a spreadsheet.

Range
80 kW to 5 MW DC
Territory
Four counties
Delivery
Full EPC in house
Since
2014
Rows of modules on a commercial roof with service walkways between them

All solutions

Commercial rooftop solar

Ballasted and attached arrays on TPO, BUR, standing seam and R-panel roofs.

Typical range
80 kW DC to 1.5 MW DC
Built for
Packing houses, warehouses, shops and school gyms
How we do it

Ground-mount solar farms

Fixed-tilt and single-axis tracker fields on marginal or fallowed ground.

Typical range
500 kW DC to 5 MW DC
Built for
Growers with fallowed corners, water districts, packing co-ops
How we do it

Solar carports and canopies

Shade structures that carry an array, an EV feed and a lighting circuit.

Typical range
60 kW DC to 900 kW DC
Built for
School districts, hospitals, civic lots, employee parking
How we do it

EV charging infrastructure

Fleet depots and workplace ports sized against the service, not the brochure.

Typical range
4 to 60 ports, Level 2 and DC fast
Built for
School bus yards, delivery fleets, ag equipment yards, offices
How we do it

Monitoring and O&M

Inverter-level telemetry, scheduled washing and warranty claims that get paid.

Typical range
All systems, in or out of our build
Built for
Any commercial array past commissioning
How we do it

Answers

Choosing between them

Not covered here? Our engineers answer directly, not through a call centre.

Ask a question(661) 555-0183

With an energy audit. Twelve months of interval data tells us the load shape, which decides whether you need generation, storage, load control or a tariff change. Every other decision follows from it.

Most of our projects combine at least two: a roof array with storage, or a carport with EV charging. Doing them together shares the switchgear, the interconnection application and the mobilisation, which takes real cost out.

Yes. We take over monitoring and maintenance for systems we did not build, and we extend or repower existing arrays where the interconnection allows it.

Our range runs from roughly 80 kW DC to 5 MW DC. Below 80 kW a commercial specialist is usually the wrong tool, and we will say so.

Bring us the bill before you bring us the roof

Every project starts with twelve months of interval data and a load shape. The array comes after that, sized to what you actually use.

CSLB #1071482 (sample). Prevailing wage on public works. Engineers answer, not a call centre.

Cookie preferences

Choose which cookies you allow. You can change this at any time from the link in the footer.