Case file / Water and municipal

Buttonwillow Water District

A 2.35 MW DC tracker field on district-owned basin margin land, serving three pumping meters. The district shifted its own load by filling storage reservoirs in the generation window instead of buying a battery.

Array
2,350 kW DC
Inverters
1,900 kW AC
Annual output
4,230 MWh
Permission to operate
September 2024
Buttonwillow Water District installation

Specification

The numbers on the record

All values are samples for this demonstration site.
ClientButtonwillow Water District
LocationButtonwillow, CA
Array rating2,350 kW DC
Inverter rating1,900 kW AC (DC to AC ratio 1.24)
Modules4,273 at 550 W
StructureSingle-axis tracker, 2.4 metre row pitch
StorageNone; load shifted through reservoir scheduling
Modelled annual production4,230,000 kWh
Specific yield1,800 kWh per kW DC per year
Load offset71 percent
Construction window22 weeks
Permission to operateSeptember 2024

What made it hard

The constraints

  • Three separate service points with different tariff schedules and very different load shapes.
  • Hardpan encountered at 1.4 metres across roughly a third of the parcel, causing pile refusal during the pull tests.
  • A Rule 21 fast-track screen failure on the largest meter, which sent the application into supplemental review.

What we did about it

The approach

  • Single-axis trackers selected after a yield study showed roughly 19 percent more annual kWh than fixed tilt at this latitude, enough to justify the maintenance overhead at this scale.
  • Ground screws substituted for driven piles across the hardpan zone, with the racking layout adjusted so the transition fell on a row boundary.
  • Reservoir filling rescheduled into the 10am to 3pm window, which flattened the evening peak without any storage capital at all.
  • Interconnection application filed eleven weeks before the geotechnical report returned, so the supplemental review ran in parallel with the civil work.

Result

Outcome

System size
2,350 kW DC / 1,900 kW AC
Modelled annual output
4,230,000 kWh
Load offset across three meters
71 percent
Tracker gain over fixed tilt
19 percent more annual kWh
Evening peak reduction
230 kW from scheduling alone
Buttonwillow Water District detailButtonwillow Water District, Buttonwillow, CA

They told us to move when we pump before they told us to buy anything. That advice cost us nothing and saved the most.

Dennis OkaforDistrict Engineer, Buttonwillow Water District

Bring us the bill before you bring us the roof

Every project starts with twelve months of interval data and a load shape. The array comes after that, sized to what you actually use.