They spent two weeks in our interval data before proposing anything. The battery is sized for one week in July and that is exactly what our bill needed.

Marisol Ibarra
Plant Manager, Kern Ridge Packing Co.
Commercial solar EPC since 2014
Kern County / Tulare County / Kings County / Fresno County
(661) 555-0183Feedback
Twelve reviews from facility managers, ranch managers, district engineers and plant operators across four counties. Every one is a sample written for this demonstration site.

4.8
12 reviews (sample)
Sectors represented
Marisol Ibarra, Kern Ridge Packing Co.What clients say
They spent two weeks in our interval data before proposing anything. The battery is sized for one week in July and that is exactly what our bill needed.
Marisol Ibarra
Plant Manager, Kern Ridge Packing Co. · Delano, CA
Everything else
They spent two weeks in our interval data before proposing anything. The battery is sized for one week in July and that is exactly what our bill needed.

Marisol Ibarra
Plant Manager, Kern Ridge Packing Co.
The recommendation that saved us most was to change when we fill reservoirs. No capital, no equipment, and it flattened our evening peak.

Dennis Okafor
District Engineer, Buttonwillow Water District
Two summers, three lots, and school opened on time both years. The conduit they left for bus charging has already been used.

Alicia Trevino
Director of Facilities, Shafter Unified School District
The audit found ninety kilowatts of leaking compressed air. They reduced the array they were going to sell us, which told me everything.

Rajan Whitfield
Operations Director, Sierra Crest Dairy Foods
They aimed the array west of south because that is when our pumps run. Everyone else pointed at a textbook.

Grace Lindqvist
Ranch Manager, Harlan Grove Farms
Three bidders quoted the whole roof. SunHarvest quoted our actual load and the fleet we are buying next year. Only one of those is a real number.

Tobias Reinhardt
Regional Facilities Lead, Valley Route Logistics
Interconnection took longer than we hoped, and they said so up front rather than after. The monthly updates through the utility review were genuinely useful.

Helena Brandt
Controller, Coastline Nut Hullers
A string dropped out in February and I got the ticket before I noticed anything. That alone justifies the monitoring agreement.

Curtis Ballard
Maintenance Supervisor, Hanford Cold Chain
They handled the plan review calendar so it never surprised our board. For a public agency that is worth as much as the kilowatt hours.

Nadia Oyelaran
Chief Business Officer, Sequoia Valley Community College
Clean install, tidy site, good crew. I would have liked earlier warning on the switchgear lead time, and they have changed how they report that since.

Ferris Holloway
General Manager, Buttonwillow Transload
The difference is that they measured our peak instead of estimating it. The demand reduction landed within a few percent of what they modelled.

Imelda Sarkisian
Operations Manager, Lemoore Fresh Pack
Prevailing wage, certified payroll, bonding, all handled without us chasing. The array works. The paperwork worked first.

Jonah Pettigrew
Facilities Director, Fresno Civic Complex
All reviews on this page are sample content written for a demonstration website.

The consistent theme is not the equipment. It is that somebody looked at the interval data before proposing anything.
CSLB #1071482 (sample). Prevailing wage on public works. Engineers answer, not a call centre.
We value your privacy
We use cookies to run this site, remember your preferences and understand how it is used.Cookie policy