Commercial solar EPC since 2014

Kern County / Tulare County / Kings County / Fresno County

(661) 555-0183

Feedback

What clients say when the array has been running a while

Twelve reviews from facility managers, ranch managers, district engineers and plant operators across four counties. Every one is a sample written for this demonstration site.

Average rating
4.8 from 12 reviews
Sectors
10
Counties
Kern, Tulare, Kings, Fresno
Status
Sample content
A commissioning technician walking a completed array

4.8

12 reviews (sample)

Rating distribution

5 star10
4 star2
3 star0
2 star0
1 star0

Sectors represented

Cold storageWater and municipalEducationFood processingAgricultureDistributionProcessingLogisticsPackingMunicipal
Marisol Ibarra, Plant Manager at Kern Ridge Packing Co.Marisol Ibarra, Kern Ridge Packing Co.

What clients say

They spent two weeks in our interval data before proposing anything. The battery is sized for one week in July and that is exactly what our bill needed.

Marisol Ibarra

Plant Manager, Kern Ridge Packing Co. · Delano, CA

System
842 kW DC plus 500 kW / 1,000 kWh storage
Sector
Cold storage

Everything else

All twelve reviews

They spent two weeks in our interval data before proposing anything. The battery is sized for one week in July and that is exactly what our bill needed.

Marisol Ibarra

Plant Manager, Kern Ridge Packing Co.

Delano, CA · 842 kW DC plus 500 kW / 1,000 kWh storage

The recommendation that saved us most was to change when we fill reservoirs. No capital, no equipment, and it flattened our evening peak.

Dennis Okafor

District Engineer, Buttonwillow Water District

Buttonwillow, CA · 2.35 MW DC single-axis tracker

Two summers, three lots, and school opened on time both years. The conduit they left for bus charging has already been used.

Alicia Trevino

Director of Facilities, Shafter Unified School District

Shafter, CA · 614 kW DC canopies over three lots

The audit found ninety kilowatts of leaking compressed air. They reduced the array they were going to sell us, which told me everything.

Rajan Whitfield

Operations Director, Sierra Crest Dairy Foods

Tulare, CA · 1.48 MW DC split roof and yard

They aimed the array west of south because that is when our pumps run. Everyone else pointed at a textbook.

Grace Lindqvist

Ranch Manager, Harlan Grove Farms

Wasco, CA · 1.12 MW DC fixed tilt, two pump meters

Three bidders quoted the whole roof. SunHarvest quoted our actual load and the fleet we are buying next year. Only one of those is a real number.

Tobias Reinhardt

Regional Facilities Lead, Valley Route Logistics

Bakersfield, CA · 960 kW DC rooftop with 8 charging ports

Interconnection took longer than we hoped, and they said so up front rather than after. The monthly updates through the utility review were genuinely useful.

Helena Brandt

Controller, Coastline Nut Hullers

Shafter, CA · 680 kW DC roof array

A string dropped out in February and I got the ticket before I noticed anything. That alone justifies the monitoring agreement.

Curtis Ballard

Maintenance Supervisor, Hanford Cold Chain

Hanford, CA · 540 kW DC, O&M contract

They handled the plan review calendar so it never surprised our board. For a public agency that is worth as much as the kilowatt hours.

Nadia Oyelaran

Chief Business Officer, Sequoia Valley Community College

Visalia, CA · 1.05 MW DC canopies and roof

Clean install, tidy site, good crew. I would have liked earlier warning on the switchgear lead time, and they have changed how they report that since.

Ferris Holloway

General Manager, Buttonwillow Transload

Buttonwillow, CA · 410 kW DC rooftop

The difference is that they measured our peak instead of estimating it. The demand reduction landed within a few percent of what they modelled.

Imelda Sarkisian

Operations Manager, Lemoore Fresh Pack

Lemoore, CA · 725 kW DC plus 250 kW / 500 kWh storage

Prevailing wage, certified payroll, bonding, all handled without us chasing. The array works. The paperwork worked first.

Jonah Pettigrew

Facilities Director, Fresno Civic Complex

Fresno, CA · 890 kW DC carport and roof

All reviews on this page are sample content written for a demonstration website.

Ask any of them what the audit found

The consistent theme is not the equipment. It is that somebody looked at the interval data before proposing anything.

CSLB #1071482 (sample). Prevailing wage on public works. Engineers answer, not a call centre.

Cookie preferences

Choose which cookies you allow. You can change this at any time from the link in the footer.