Case file / Education

Shafter Unified canopies

Solar canopies across three campus lots, built in two summer windows. The structures carry the array, the lot lighting and the conduit for a future electric bus fleet.

Array
614 kW DC
Inverters
500 kW AC
Annual output
1,038 MWh
Permission to operate
November 2024
Shafter Unified canopies installation

Specification

The numbers on the record

All values are samples for this demonstration site.
ClientShafter Unified School District
LocationShafter, CA
Array rating614 kW DC
Inverter rating500 kW AC (DC to AC ratio 1.23)
Modules1,116 at 550 W
StructureSingle-slope steel canopies over three parking lots
StorageNone; EV conduit stubbed for 12 future ports
Modelled annual production1,038,000 kWh
Specific yield1,691 kWh per kW DC per year
Load offset58 percent
Construction window14 weeks
Permission to operateNovember 2024

What made it hard

The constraints

  • All heavy construction confined to the June to August break, across two consecutive summers.
  • A plan-review cycle for structures on a school site that had to be started before the design was fully priced.
  • Preserving every existing accessible stall while keeping column spacing economical.

What we did about it

The approach

  • Single-slope canopies at 7 degrees, oriented to the existing drive aisles so no stall was lost and no aisle narrowed.
  • Column grid set on the stall stripe lines, with longer spans used only over the accessible parking bay.
  • Under-canopy LED lighting on photocell control, replacing four ageing pole fixtures and removing their maintenance line.
  • Switchgear and conduit sized for twelve future DC charging ports, with pull boxes left at the bus loading zone.

Result

Outcome

System size
614 kW DC / 500 kW AC
Modelled annual output
1,038,000 kWh
District load offset
58 percent
Covered parking
186 stalls across three lots
Future EV capacity stubbed
12 ports
Shafter Unified canopies detailShafter Unified canopies, Shafter, CA

Parents noticed the shade before anyone noticed the savings. Both showed up, but the shade showed up first.

Alicia TrevinoDirector of Facilities, Shafter Unified School District

Bring us the bill before you bring us the roof

Every project starts with twelve months of interval data and a load shape. The array comes after that, sized to what you actually use.