Commercial solar EPC since 2014

Kern County / Tulare County / Kings County / Fresno County

(661) 555-0183

Start here

Request a site assessment

Four short steps. What comes back is a written basis of design with system size in kW DC, modelled annual kWh, demand impact and an installed cost range. It costs nothing.

Steps
Four
Reply
One business day
Cost
No charge
Who replies
An engineer
Engineers walking a site with drawings

Assessment request form

Step 1 of 4

What kind of facility is it?

Pick the closest match. It changes which load questions we ask next.

Where is it, and what does it cost you?

Approximate figures are fine. We pull your real interval data later.

Please tell us where the site is.

Please choose a utility.

Please enter an approximate monthly bill.

What can carry the array?

Roof, ground, parking, or a combination. Tell us what you know.

Please choose a mounting surface.

Please tell us what matters most.

Who should our engineer contact?

An engineer replies, not a salesperson. Usually within one business day.

Please enter your name.

Please enter your organisation.

Please enter a valid email address.

Please enter a phone number we can reach you on.

Request received

Thank you. Your assessment is queued.

Here is what happens next, in order.

  1. Within one business day. An engineer emails you an interval-data release form for your utility account.
  2. Days 2 to 10. We pull twelve months of 15-minute data and build your load shape and bill decomposition.
  3. Around day 14. A site visit: roof or ground survey, switchgear, service capacity and shading.
  4. Around day 21. A written basis of design with system size in kW DC, modelled kWh, demand impact and an installed cost range.

Prefer to talk first? Call (661) 555-0183. This is a demonstration form, so nothing was actually sent.

Cookie preferences

Choose which cookies you allow. You can change this at any time from the link in the footer.