Commercial solar EPC since 2014

Kern County / Tulare County / Kings County / Fresno County

(661) 555-0183

Legal

Terms of Service

The terms that apply when you use this website or book services with SunHarvest Commercial Solar.

Last updated September 1, 2026

Agreement

By using this website you agree to these terms. If you do not agree, please do not use the site. You can reach us at projects@sunharvestsolar.com, by phone at (661) 555-0183, or by mail at 3410 Buck Owens Blvd, Suite 140, Bakersfield, CA 93308.

Use of this website

Content on this site is provided for general information. You agree not to misuse the site, attempt to gain unauthorized access, or copy content for commercial use without permission.

Quotes, estimates and bookings

Prices, estimates and availability shown online are indicative until confirmed in writing by our team. Final pricing depends on an assessment of your specific needs. Bookings are confirmed only when you receive a confirmation from us.

Cancellations

Please give us as much notice as possible if you need to cancel or reschedule. Any applicable cancellation terms will be explained when your booking is confirmed.

Limitation of liability

To the fullest extent permitted by law, we are not liable for indirect or consequential losses arising from use of this website. Nothing in these terms limits liability that cannot be limited by law.

Production estimates and modelled figures

Any production figure, saving, payback period, incentive amount or cost shown on this website or in a preliminary document is a model based on stated assumptions. Actual results depend on weather, site conditions, equipment performance, utility tariffs, your operating patterns and applicable law. Modelled figures are not warranties.

Binding production commitments, where offered, appear only in an executed contract, are weather adjusted, and carry a stated remedy.

Licensing and scope of work

SunHarvest Commercial Solar holds CSLB #1071482 (sample) - C-10 Electrical and B General Building. All work is performed under permit and inspected by the authority having jurisdiction. We do not provide tax, legal, accounting or investment advice, and nothing on this website should be relied upon as any of those.

Utility interconnection approval and permission to operate are decisions of the utility, not of SunHarvest. We manage the process and cannot guarantee the outcome or the timetable.

Governing law

These terms are governed by the laws of the State of CA.

This is a demonstration website with sample content. SunHarvest Commercial Solar is not a real company. Every price, production figure, incentive amount, payback period and utility rate shown here is illustrative only. Actual system output depends on site conditions, equipment and weather. Tax treatment depends on your circumstances: talk to a licensed tax professional before relying on any incentive figure.

Questions about any of this?

Our office will point you at the right person. Nothing here is intended to be difficult to read.

CSLB #1071482 (sample). Prevailing wage on public works. Engineers answer, not a call centre.

Cookie preferences

Choose which cookies you allow. You can change this at any time from the link in the footer.